参考文献/References:
[1] 李澍,吴瑜,杨立斌.面向离散企业制造执行系统关键技术研究[J].控制工程,2015,22(S1):13-16.[2] Liqi Zhang,Lingfa Lu,Jinjiang Yuan.Two-machine open- shop scheduling with rejection to minimize the makespan[J]. OR Spectrum,2016,38(2):69-81.
[3] Gao K Z, Suganthan P N, Pan Q K, et al. Artificial bee colony algorithm for scheduling and rescheduling fuzzy flexible job shop problem with new job insertion[J]. KNOWLEDGE-BASED SYSTEMS,2016,109: 1-16.
[4] Knopp S, Dauzere-Peres S, Yugma C. A batch-oblivious approach for Complex Job-Shop scheduling problems[J]. Design Automation for Embedded Systems,2017,263(1): 50-61.
[5] Shen J, Wang L, Deng J, et al. A Pareto-Based Discrete Harmony Search Algorithm for Bi-objective Reentrant Hybrid Flowshop Scheduling Problem[M].Advances in Intelligent Systems and Computing,2016: 382,435-445.
[6] 李帆,高东,许欣,等.改进蝙蝠算法柔性作业车间调度问题研究[J].计算机工程与应用,2018,54(21):265-270.
[7] 肖华军,柴子力,张超勇,等.基于混合化学反应算法的柔性作业车间调度[J].计算机集成制造系统,2018,24(09): 2234-2245.
[8] Zhang H, Xie J, Ge J, et al. A hybrid adaptively genetic algorithm for task scheduling problem in the phased array radar[J]. EUROPEAN JOURNAL of OPERATIONAL RESEARCH,2019,272(3): 868-878.
[9] Agarwal M. Genetic Algorithm-Enabled Particle Swarm Optimization (PSOGA)-Based Task Scheduling in Cloud Computing Environment[J].INTERNATIONAL JOURNAL OF INFORMATION TECHNOLOGY & DECISION MAKING, 2018,17(4): 1237-1267.
[10] Zheng X, Wang L. A novel fruit fly optimization algorithm for the semiconductor final testing scheduling problem[J]. KNOWLEDGE-BASED SYSTEMS, 2014,57: 95-103.
[11] Celli G, Pilo F, Pisano G, et al. Distribution energy storage investment prioritization with a real coded multi-objective Genetic Algorithm[J]. ELECTRIC POWER SYSTEMS RESEARCH. 2018, 163(A): 154-163.
[12] Wang K, Choi S H, Lu H. A hybrid estimation of distribution algorithm for simulation-based scheduling in stochastic permutation flowshop[J].COMPUTERS & INDUSTRIAL ENGINEERING, 2015,90: 186-196.
[13] Meng T, Pan Q, Sang H. A hybrid artificial bee colony algorithm for a flexible job shop scheduling problem with overlapping in operations[J].INTERNATIONAL JOUR- NAL of PRODUCTION RESEARCH,2018,56(16): 5278-5292.
[14] Xanthopoulos A S, Koulouriotis D E. Cluster analysis and neural network-based metamodeling of priority rules for dynamic sequencing[J]. JOURNAL of INTELLIGENT MANUFACTURING, 2018, 29(1): 69-91.
[15] Jiménez-Carrión M. Algoritmo Genético Simple para Resolver el Problema de Programación de la Tienda de Trabajo(Job Shop Scheduling)[J]. Información tecnológica, 2018, 29(5): 299-314.
[16] Kacem I, Hammadi S, Borne P. Pareto-optimality approach for flexible job-shop scheduling problems: hybridiza-tion of evolutionary algorithms and fuzzy logic[J]. MATHEMATICS and COMPUTERS IN SIMULATION, 2002,60(5): 245-276.
[17] 栾飞,王雯,傅卫平,等.基于PST层次结构的改进GA求解柔性车间调度问题[J].计算机集成制造系统,2014, 20(10): 2494-2501.
[18] 孔飞,吴定会,纪志成.基于双层粒子群优化算法的柔性作业车间调度优化[J].计算机应用,2015,35(02):476-480.
[19] 薛宏全,魏生民,张鹏,等.基于多种群蚁群算法的柔性作业车间调度研究[J].计算机工程与应用,2013,49(24): 243-248+261.
相似文献/References: