参考文献/References:
[1] DM Yao,JG Li,YT Song, et al. EAST in-vessel components design[J].Fusion Engineering and Design,2005(75-79): 491–494.[2] Y Song, S Wu, Y Wan, et al. Concept design on RH mainten- ance of CFETR Tokamak reactor[J].Fusion Engineering and Design,2014,89(10):2331–2335.
[3] S S Shi,Y T Song, Y Cheng, et al.Design and Implementation of Storage Cask System for EAST Articulated Inspection Arm(AIA) Robot[J].New York:Springer Science+Business Media, Journal of Fusion Energy, 2015.
[4] L Gargiulo, P Bayetti, V Bruno et al. Development of an ITER relevant inspection robot[J].Fusion Engineering and Design,2008,83(10):1833–1836.
[5] HJ Tang, G Wang, C Chen et al. A Hybrid of Fuzzy and PID Controller for EAST AIA CASK Baking System[J].Fusion Energy,2015,34(1):42–48.
相似文献/References: